Site Assessment & Analysis

Solar Feasibility Study
UAE

Harutto Solar prepares professional solar feasibility studies for commercial and industrial properties in the UAE — covering site assessment, shading analysis, yield simulation, system design, financial model, and DEWA Shams Dubai compatibility review.

Financial models are indicative only. Actual performance depends on system output, DEWA tariff, and consumption profile at the time of operation.

Site Visit & Assessment

Physical roof or ground area measurement. Structural condition noted. Shading sources identified (parapets, HVAC, adjacent buildings). Orientation and tilt recorded.

Yield Simulation

PVsyst or equivalent simulation with site-specific irradiation data, actual orientation and shading factors, and system losses. Annual yield and monthly profile produced.

Indicative System Design

Panel quantity, inverter configuration, and single-line schematic. System capacity based on available area and DEWA contracted demand limit.

Financial Model

Capital cost estimate, indicative bill offset, and payback calculation based on DEWA tariff slab and consumption profile. Indicative only — not a guarantee.

DEWA Shams Dubai Compatibility

System design reviewed for Shams Dubai eligibility: capacity, inverter type, export requirements, and net-metering applicability.

Professional Study Report

Written report suitable for investment decision, bank finance submission, or landlord / authority approval processes.

Frequently Asked Questions

What does a solar feasibility study include?

A Harutto Solar feasibility study covers: site visit and roof/area assessment; shading analysis; available capacity based on roof area, structural constraints, and DEWA contracted demand; yield simulation using site-specific irradiation data; indicative system design and cost estimate; project-specific financial model (capital cost, bill offset, indicative payback); and DEWA Shams Dubai compatibility review. The output is a document the client can use to support an investment decision.

How is the yield simulation prepared?

Harutto Solar uses PVsyst or equivalent solar simulation software with site-specific irradiation data, panel orientation, shading factors, and system losses to model annual energy generation. The simulation output includes annual yield, performance ratio, and monthly generation profile. Actual generation will vary from the simulation due to real-world conditions.

Does the feasibility study commit me to proceeding with installation?

No. The feasibility study is an independent assessment. If the results support proceeding, Harutto Solar can provide a full EPC proposal. There is no obligation to proceed with installation following the study.

Is the financial analysis in a solar feasibility study guaranteed?

No financial outcome is guaranteed. The financial model in a Harutto Solar feasibility study is based on the design parameters, simulation outputs, current DEWA tariff, and capital cost estimate at the time of the study. Actual financial performance depends on system performance, DEWA tariff changes, consumption profile changes, and other factors beyond our control. The model is indicative only.

Can a feasibility study be used for a bank or landlord approval?

Yes. Harutto Solar feasibility studies are prepared as professional documents suitable for submission to banks, landlords, building owners, or investors as part of a financing or approval process. Additional documentation (e.g., structural assessment, authority pre-approval confirmation) may be required by the approving party.

Request a Solar Feasibility Study

Contact Harutto Solar with your property details and we will arrange a site visit and prepare a full feasibility study.